Monday, February 10, 2014
Bathroom Remodel � A step back
After looking at the medicine cabinets for a while, it was decided that they were too high. So I pulled them out and am in the process of lowering them 4.5”. With the SawsAll, I cut the sheetrock down and then cut the framing back 1.5”. I built a frame to go in the top of the opening and added sheetrock to it. I have started mudding the patch. Once that is done, I’ll re-paper and re-install the medicine cabinets and light fixtures. Then I’ll be back to where I was…
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment